
Masonry
Natural stone, brick, block
Pickering, Ontario
Durham and the GTA confirm
Estimates
Mon to Sat hours
Stone, set by hand,
to outlast the house
it holds up.
SIX
STAR
Booking spring 2027 confirm
Six stones

Sedimentary, 3 to 4 Mohs→

Igneous, 6 to 7 Mohs→
Sandstone, Ledgestone, Fieldstone, Cast stone
Request a quote
→
647 204 0445 confirm
It took the earth 450 million years to make this stone.
It takes us about thirty seconds to read it: the bed, the grain, the face it wants to show.
Hover the stone to split it along its bed.
Drag to turn it. Move to move the light.
We think in stone, then in grids.
A cubic metre of Ontario limestone. Every course carries every course above it.
Mortar is weaker than the stone on purpose. When the wall has to give, the joint gives and the stone stays.
Every course is set to a string pulled tight between two corners, then checked against it before the next one starts.
A wall is a thousand small decisions.
Which stone, which face out, which way the bed runs, how wide the joint. Move across the grid and the courses come up to meet you.
Upright to gravity, checked with a level on every corner.
Every course flat to the line, end to end.
Corners at ninety degrees, measured on the diagonal.
All three at once, on a wall you will look at for fifty years.
Six stones. One standard.
Each one chosen for the job, the weather and the house.
Hover a stone to lift it. Drag to turn it.


Older than
the lakes.
The limestone under southern Ontario settled on the floor of a warm, shallow sea. The lake you can see from Pickering is a puddle by comparison. A material with that much patience deserves a crew with some.
Left by the ice
About 15,000 years verify
The old lake bluff runs through Durham
About 12,000 years verify
Soft, layered, not for walls
About 445 million years verify
The bed our stone comes from
About 450 million years verify
The basement under everything
Over 1 billion years verify
10⁰ yrs
10¹ yrs
10² yrs
10³ yrs
10⁴ yrs
10⁵ yrs
10⁶ yrs
10⁷ yrs
10⁸ yrs
10⁹ yrs
A wall we build, at a hundred years
The lakes
The limestone
Time in years, log scale. Scroll moves the red marker from today back to the sea floor.
BEFORE THE
FIRST STONE,
A LINE.
BEFORE THE
FIRST STONE,
A LINE.
BEFORE THE
FIRST STONE,
A LINE.
A mason's line is a string pulled tight between two corners. Every stone in a course is set to it and every course is checked against it. It costs almost nothing and decides almost everything.
Pull the line
Limestone

Mohs 1 to 10
Granite

Mohs 1 to 10
GraniteIn view
LimestoneIn view
Sandstone
Ledgestone
Fieldstone
Cast stoneBehind the face
Six layers between your living room and February. We build every one of them, and you only ever see the first.
About four inches of natural stone, split face out
Mixed for the stone and the season
A one inch gap, so water drains instead of soaking in
Wrapped, lapped and taped behind the cavity
The structure the ties hold on to
At the base, where the water finally leaves
Scroll pulls the wall apart layer by layer, then closes it again. client to confirm wall assembly

The joint is where a wall tells the truth.
Flush
Concave
V
Weathered
Struck
Raked
Mortar is softer than stone on purpose. It takes the movement and sheds the water, and one day it is cut out and renewed while the stone stays put. Drag the jointer to change the profile.
Stone is laid in the cold.
Every joint we strike has to survive a February.
-40 °C
-20 °C
0 °C
20 °C
40 °C
200 °C
400 °C
600 °C
800 °C
1000 °C
A Pickering winter night
Mortar must not freeze while it cures
The laying day we wait for
The back of a working firebox
The fire itself
0 °C The joint, curing
Temperatures are typical values for the story verify
The frame rides the scale as you scroll: joint, hands, hearth, then it opens into the fire.

The warmest room is made of the coldest material.
Where the fire sitsSmoke shelf
Turns the draft up the flueFlue
Sized to the opening verifyHearth extension
Stone in front of the opening code
Hover a part of the drawing and the photo lights that part of the fireplace.
For the house you
mean to keep.

Stand-in image replace with a client project
confirm services with client

Winter is the inspector.
Days this winter the wall froze and thawed. Illustrative replace with Pickering data
Water grows by about nine percent when it freezes
The line every red mark crosses
Scroll runs the season left to right. Each red mark ticks as it is crossed, and the count climbs.
Five stars is the scale. Six is the standard.
Six promises, one on each point of the mark. Each one is something you can check on site, not a word on a page.
One project manager
Start to finish, one name, one phone
Drawings answered with drawings
A quote written line by line against yours
A written price
Before a single stone moves confirm
Insured, WSIB covered
Certificates on request confirm
A site swept every evening
Your driveway is not our yard confirm
Workmanship guaranteed
In writing, for n years
Scroll draws the rays one by one. Hover a ray and its promise opens with the proof behind it.
(01)
(02)
(03)
(04)
(05)
(06)
(07)
(08)
(09)
(10)
(11)
(12)
Limestone porch

[Town] [Year]
Fireplace

[Town] [Year]
Front steps

[Town] [Year]
Veneer, rear elevation

[Town] [Year]
Garden wall

[Town] [Year]
Repointing

[Town] [Year]
Archive
Every job we are allowed to show, filed by stone, town and year. Drag to sort, open to see the build. client photos needed, these are stand-ins

You send this
Send drawings.
Get a takeoff back in n days.
For custom builders, general contractors and developers. Every line priced against your drawings, manpower scheduled to your sequence, one project manager who answers the phone. confirm services and turnaround
confirmWSIB
confirmCrew
sizeArea
Durham, GTA confirm
We send this back
Fig. 2 Front elevation, stone areas hatched and tagged to the takeoff

From first call
to clean-down.
A typical front elevation timings from client
Weather moves the middle. It never moves the line.

Pick up a trowel.
No experience needed. Mix, carry, clean, learn the site. Training provided.
On the tools beside a mason. Set out, bed, lay. confirm path
One to three years on the tools, reliable transport, a strong work ethic.
We are hiring masons and labourers. Labourers need no experience; we train. Masons need one to three years on the tools, a way to get to site and a strong work ethic.
Set the last stone.
Tell us about the wall. Every answer lays a course. Send it and the last stone goes in.