Masonry
Natural stone, brick, block

Pickering, Ontario
Durham and the GTA confirm

Estimates
Mon to Sat hours

Stone, set by hand,
to outlast the house
it holds up.

SIX
STAR

Booking spring 2027 confirm

Six stones

Limestone
Sedimentary, 3 to 4 Mohs
→
Granite
Igneous, 6 to 7 Mohs
→

Sandstone, Ledgestone, Fieldstone, Cast stone

Request a quote

→

647 204 0445 confirm

A limestone block falling through a raking light, with the headline It took the earth 450 million years to make this stone.
Specimen 01Limestone, Ordovician Size900 × 300 × 440 mm Height6.00 m MassAbout 300 kg The stonePart 1 of 5

It took the earth 450 million years to make this stone.

It takes us about thirty seconds to read it: the bed, the grain, the face it wants to show.

Hover the stone to split it along its bed.
Drag to turn it. Move to move the light.

We think in stone, then in grids.

WeightA.1
2,500kg/m³

A cubic metre of Ontario limestone. Every course carries every course above it.

MortarA.2
< 1mortar to stone

Mortar is weaker than the stone on purpose. When the wall has to give, the joint gives and the stone stays.

StoneMortar
The lineA.3
0mm off level

Every course is set to a string pulled tight between two corners, then checked against it before the next one starts.

A wall is a thousand small decisions.

Which stone, which face out, which way the bed runs, how wide the joint. Move across the grid and the courses come up to meet you.

01
Plumb

Upright to gravity, checked with a level on every corner.

02
Level

Every course flat to the line, end to end.

03
Square

Corners at ninety degrees, measured on the diagonal.

04
True

All three at once, on a wall you will look at for fifty years.

Six stones. One standard.

Each one chosen for the job, the weather and the house.

Hover a stone to lift it. Drag to turn it.

Older than
the lakes.

The limestone under southern Ontario settled on the floor of a warm, shallow sea. The lake you can see from Pickering is a puddle by comparison. A material with that much patience deserves a crew with some.

Glacial till
Left by the ice
About 15,000 years verify
Lake Iroquois shoreline
The old lake bluff runs through Durham
About 12,000 years verify
Shale
Soft, layered, not for walls
About 445 million years verify
Limestone
The bed our stone comes from
About 450 million years verify
Precambrian granite
The basement under everything
Over 1 billion years verify

10⁰ yrs

10¹ yrs

10² yrs

10³ yrs

10⁴ yrs

10⁵ yrs

10⁶ yrs

10⁷ yrs

10⁸ yrs

10⁹ yrs

A wall we build, at a hundred years

The lakes

The limestone

Time in years, log scale. Scroll moves the red marker from today back to the sea floor.

BEFORE THE
FIRST STONE,
A LINE.

BEFORE THE
FIRST STONE,
A LINE.

BEFORE THE
FIRST STONE,
A LINE.

A mason's line is a string pulled tight between two corners. Every stone in a course is set to it and every course is checked against it. It costs almost nothing and decides almost everything.

Pull the line

Limestone

Ls
OriginSedimentary, Ordovician sea floor verify
Hardness3 to 4 Mohs
DensityAbout 2,500 kg/m³ verify
FinishSawn, split, tooled, honed
Best forAshlar, sills, caps, steps

Mohs 1 to 10

Granite

Gr
OriginIgneous, cooled from magma
Hardness6 to 7 Mohs
DensityAbout 2,700 kg/m³ verify
FinishSplit, flamed, honed, polished
Best forSteps, caps, paving, hearths

Mohs 1 to 10

Granite
In view
Limestone
In view
Sandstone
Ledgestone
Fieldstone
Cast stone

Behind the face

Six layers between your living room and February. We build every one of them, and you only ever see the first.

1Stone veneer
About four inches of natural stone, split face out
2Mortar bed
Mixed for the stone and the season
3Air space and ties
A one inch gap, so water drains instead of soaking in
4Weather barrier
Wrapped, lapped and taped behind the cavity
5Sheathing
The structure the ties hold on to
6Flashing and weeps
At the base, where the water finally leaves

Scroll pulls the wall apart layer by layer, then closes it again. client to confirm wall assembly

The joint is where a wall tells the truth.

Flush

Concave

V

Weathered

Struck

Raked

Mortar is softer than stone on purpose. It takes the movement and sheds the water, and one day it is cut out and renewed while the stone stays put. Drag the jointer to change the profile.

Stone is laid in the cold.

Every joint we strike has to survive a February.

-40 °C

-20 °C

0 °C

20 °C

40 °C

200 °C

400 °C

600 °C

800 °C

1000 °C

A Pickering winter night

Mortar must not freeze while it cures

The laying day we wait for

The back of a working firebox

The fire itself

0 °C  The joint, curing

Temperatures are typical values for the story verify

The frame rides the scale as you scroll: joint, hands, hearth, then it opens into the fire.

The warmest room is made of the coldest material.

Firebox
Where the fire sits
Smoke shelf
Turns the draft up the flue
Flue
Sized to the opening verify
Hearth extension
Stone in front of the opening code

Hover a part of the drawing and the photo lights that part of the fireplace.

For the house you
mean to keep.

Stand-in image replace with a client project

Front elevationsNatural stone and brick veneer→
Porches and stepsLimestone treads, granite landings→
Walkways and patiosFlagstone, ledgestone, interlock→
Retaining and garden wallsDry laid and mortared→
FireplacesInside and out→
Repointing and repairSills, caps, brick replacement→

confirm services with client

Winter is the inspector.

10 °C0 °C-10 °C-20 °CDECJANFEBMAR
45
Days this winter the wall froze and thawed. Illustrative replace with Pickering data
+9%
Water grows by about nine percent when it freezes
0 °C
The line every red mark crosses

Scroll runs the season left to right. Each red mark ticks as it is crossed, and the count climbs.

Five stars is the scale. Six is the standard.

Six promises, one on each point of the mark. Each one is something you can check on site, not a word on a page.

01
One project manager
Start to finish, one name, one phone
02
Drawings answered with drawings
A quote written line by line against yours
03
A written price
Before a single stone moves confirm
04
Insured, WSIB covered
Certificates on request confirm
05
A site swept every evening
Your driveway is not our yard confirm
06
Workmanship guaranteed
In writing, for n years

Scroll draws the rays one by one. Hover a ray and its promise opens with the proof behind it.

(01)

(02)

(03)

(04)

(05)

(06)

(07)

(08)

(09)

(10)

(11)

(12)

Limestone porch

[Town] [Year]

Fireplace

[Town] [Year]

Front steps

[Town] [Year]

Veneer, rear elevation

[Town] [Year]

Garden wall

[Town] [Year]

Repointing

[Town] [Year]

Archive

Every job we are allowed to show, filed by stone, town and year. Drag to sort, open to see the build. client photos needed, these are stand-ins

You send this

Send drawings.
Get a takeoff back in n days.

For custom builders, general contractors and developers. Every line priced against your drawings, manpower scheduled to your sequence, one project manager who answers the phone. confirm services and turnaround

Insurance
confirm
WSIB
confirm
Crew
size
Area
Durham, GTA confirm

We send this back

01
02
03
04
07

Fig. 2  Front elevation, stone areas hatched and tagged to the takeoff

TagItemUnitQuantity
01Natural stone veneer, limestonem²86.4
02Sills, honed limestonelm14.2
03Caps, granitelm22.0
04Quoins, cast stonepcs48
05Brick ties, stainlesspcs370
06Through-wall flashinglm31.5
07Weep ventspcs24
08Crew days, two masonsd18
Sample takeoff, illustrative quantities onlyTakeoff 0001  ·  Rev A
Day 1Call
Week 1Site visit and measure
Week 1Drawings and written quote
Week 2Stone chosen
Week 3Setting out
Weeks 3 to 6Laying
Week 6Pointing
Week 7Clean-down
Week 7Walkthrough

From first call
to clean-down.

A typical front elevation timings from client
Weather moves the middle. It never moves the line.

1Pointing trowel
2Brick trowel
3Jointer
4Line blocks and string
5Bolster chisel
6Club hammer
7Level

Pick up a trowel.

LabourerDay one

No experience needed. Mix, carry, clean, learn the site. Training provided.

ApprenticeThen

On the tools beside a mason. Set out, bed, lay. confirm path

MasonHiring now

One to three years on the tools, reliable transport, a strong work ethic.

We are hiring masons and labourers. Labourers need no experience; we train. Masons need one to three years on the tools, a way to get to site and a strong work ethic.

Apply with a resume →or a photo of the best wall you have built

Set the last stone.

Tell us about the wall. Every answer lays a course. Send it and the last stone goes in.

01
02
03
04The job
05Stone
06
36 m²About 130 stones at a 900 × 300 face
07Start
08

Or call 647 204 0445